Project Part B: Hypothesis Testing and Confidence Intervals
Your Instructor will provide you with four manager speculations, a.-d., in the Doc Sharing file.
Submission: The report from part 3 + all of the relevant work done in the hypothesis testing (including Minitab) in 1., and the confidence intervals (Minitab) in 2. as an appendix.
Format for report:
Project Part B: Grading Rubric
Category |
Points |
% |
Description |
Addressing each speculation – 20 pts. each |
80 |
80 |
hypothesis test, interpretation, confidence interval and interpretation |
Summary report |
20 |
20 |
1 paragraph on each of the speculations |
Total |
100 |
100 |
A quality paper will meet or exceed all of the above requirements. |